I am curious if anybody ever had experience with renting a warehouse versus renting a garage, what are the benefits versus the negatives? Under what set of conditions is one preferable to the other?
I am in the process of scaling my side-business (part B and part C) and i need a larger place to house employees and inventory.
I will be training about 20 or so employees total(university students with technical/science background). However, i will be only using 5 students maximum at any given time, each working for roughly 4 or 5 hours at a clip.
I prefer students because they are smarter, adaptable, always innovative and will have ideas to contribute. They are also cheap. The negatives is that they are notoriously unreliable, hence, i want a pool of students that i can pick 5 from when somebody called out from work.
I am limiting the hours to 4 or 5 hours because that is what i can realistically expect a student to work for, at a stretch, while going to school.
My original intent was to go with a warehouse, but looking at the rent prices per square feet versus the amount of space that i actually need.... i am leaning more and more towards renting a garage.
I want to build enough workstation for 5 people, i dont need more than 17 feet by 17 feet. I believe i can do 6 times the current volume of work i am doing with just 17 X 17 feet space + 5 people. Most warehouses are much, much bigger than that and i don't need the extra space for now-- i don't need 7500sqft to do what i need.
Garage are cheaper too: seen adequate size for less than $400 per month; in fact, saw a 4200sqft with security cameras and heating for $200 per month(minus utilities) see picture below:
![[Image: 34tdhlc.jpg]](http://oi61.tinypic.com/34tdhlc.jpg)
Heating in winter shouldn't be a problem since i will go for heated garage.
Garages are also more available than warehouses-- i need a place physically closer to the engineering/science college where i am recruiting talent pool of student workers for my side-business. I want the place close enough so that they can simply walk to work from school or dormitory.
The main advantage for Warehouse that i can currently think of is the important issue of SAFETY/SECURITY. Almost hands down, the security packages of warehouse beat that of garages. Does anybody have any experience with this kind of thing before? any advice? I will make final decision by the end of the month(roughly 12 days from now).
Clearly, cost is a big issue in my decision making-- it will affect my overhead. Are there advantages to Warehouse that i am simply overlooking because i like the price of Garage better?
Anyways, below is the rough schematic of what the workstation for 5 people will look like: it is going to have a L- shaped, with stacked levels for storage and quick retrieval of spare computer parts, etc. To the side of the L-shaped structure will be a extra-storage space for computer parts(estimated capacity: 1000 laptops). Right now, all by myself i process 100 computers every 3 weeks or so; i have more contacts and leads that will allow me to expand much bigger than this, shipping out more products. The back of the L-shaped structure will be space for sorting, packaging, wrapping, labeling etc. also the place for a used microwave, fridge/freezer, coffee maker, etc for employees refreshment, etc; 17 feet by 17 feet is all i need. Anyways, here is the rough schematic i drew up:
![[Image: 20f2tf5.jpg]](http://oi57.tinypic.com/20f2tf5.jpg)
.
I appreciate any input.
regards,
Nemencine
I am in the process of scaling my side-business (part B and part C) and i need a larger place to house employees and inventory.
I will be training about 20 or so employees total(university students with technical/science background). However, i will be only using 5 students maximum at any given time, each working for roughly 4 or 5 hours at a clip.
I prefer students because they are smarter, adaptable, always innovative and will have ideas to contribute. They are also cheap. The negatives is that they are notoriously unreliable, hence, i want a pool of students that i can pick 5 from when somebody called out from work.
I am limiting the hours to 4 or 5 hours because that is what i can realistically expect a student to work for, at a stretch, while going to school.
My original intent was to go with a warehouse, but looking at the rent prices per square feet versus the amount of space that i actually need.... i am leaning more and more towards renting a garage.
I want to build enough workstation for 5 people, i dont need more than 17 feet by 17 feet. I believe i can do 6 times the current volume of work i am doing with just 17 X 17 feet space + 5 people. Most warehouses are much, much bigger than that and i don't need the extra space for now-- i don't need 7500sqft to do what i need.
Garage are cheaper too: seen adequate size for less than $400 per month; in fact, saw a 4200sqft with security cameras and heating for $200 per month(minus utilities) see picture below:
![[Image: 34tdhlc.jpg]](http://oi61.tinypic.com/34tdhlc.jpg)
Heating in winter shouldn't be a problem since i will go for heated garage.
Garages are also more available than warehouses-- i need a place physically closer to the engineering/science college where i am recruiting talent pool of student workers for my side-business. I want the place close enough so that they can simply walk to work from school or dormitory.
The main advantage for Warehouse that i can currently think of is the important issue of SAFETY/SECURITY. Almost hands down, the security packages of warehouse beat that of garages. Does anybody have any experience with this kind of thing before? any advice? I will make final decision by the end of the month(roughly 12 days from now).
Clearly, cost is a big issue in my decision making-- it will affect my overhead. Are there advantages to Warehouse that i am simply overlooking because i like the price of Garage better?
Anyways, below is the rough schematic of what the workstation for 5 people will look like: it is going to have a L- shaped, with stacked levels for storage and quick retrieval of spare computer parts, etc. To the side of the L-shaped structure will be a extra-storage space for computer parts(estimated capacity: 1000 laptops). Right now, all by myself i process 100 computers every 3 weeks or so; i have more contacts and leads that will allow me to expand much bigger than this, shipping out more products. The back of the L-shaped structure will be space for sorting, packaging, wrapping, labeling etc. also the place for a used microwave, fridge/freezer, coffee maker, etc for employees refreshment, etc; 17 feet by 17 feet is all i need. Anyways, here is the rough schematic i drew up:
![[Image: 20f2tf5.jpg]](http://oi57.tinypic.com/20f2tf5.jpg)
.
I appreciate any input.
regards,
Nemencine
.
A year from now you will wish you had started today.....May fortune favours the bold.